How do the core versions differ?
| Model | Core configuration | Needs to evaluate first |
|---|---|---|
| O1 | K1V2 + GNSS/IMU + monochrome stereo | Core fusion and cost-sensitive integration |
| O1 MAX | K1V2 + GNSS/IMU + monochrome stereo + mmWave radar | Demanding outdoor sites and additional obstacle sensing |
| O2 | K1V3 + GNSS/IMU + color stereo | Color environmental information and detailed interaction |
Entry-level and tailored options
O1 Lite, educational configurations and industry algorithm packages can be discussed with the team. Confirm availability, functionality, software licensing and accessories before testing or procurement. Different names and delivery forms within a series should not be assumed equivalent.
Selecting by application
Agriculture and demanding outdoor inspection can start with an O1 MAX evaluation. Logistics selection should consider color information, transitions and the existing controller. Mowing and cost-sensitive platforms can start with O1. Initial selection does not replace field acceptance.
Information for an inquiry
- Platform, chassis, speed and payload.
- Area, obstruction, lighting and weather conditions.
- Accuracy target, task success criteria and exception handling.
- Existing sensors, interfaces, power and mounting space.
- Sample quantity, expected production volume and schedule.
A practical evaluation sequence
Confirm data integration and coordinates, test continuity and critical missions, then agree delivered configuration, acceptance criteria and support scope. Contact info@hopo.ai to begin.
