How do the core versions differ?

ModelCore configurationNeeds to evaluate first
O1K1V2 + GNSS/IMU + monochrome stereoCore fusion and cost-sensitive integration
O1 MAXK1V2 + GNSS/IMU + monochrome stereo + mmWave radarDemanding outdoor sites and additional obstacle sensing
O2K1V3 + GNSS/IMU + color stereoColor environmental information and detailed interaction

Entry-level and tailored options

O1 Lite, educational configurations and industry algorithm packages can be discussed with the team. Confirm availability, functionality, software licensing and accessories before testing or procurement. Different names and delivery forms within a series should not be assumed equivalent.

Selecting by application

Agriculture and demanding outdoor inspection can start with an O1 MAX evaluation. Logistics selection should consider color information, transitions and the existing controller. Mowing and cost-sensitive platforms can start with O1. Initial selection does not replace field acceptance.

Information for an inquiry

  • Platform, chassis, speed and payload.
  • Area, obstruction, lighting and weather conditions.
  • Accuracy target, task success criteria and exception handling.
  • Existing sensors, interfaces, power and mounting space.
  • Sample quantity, expected production volume and schedule.

A practical evaluation sequence

Confirm data integration and coordinates, test continuity and critical missions, then agree delivered configuration, acceptance criteria and support scope. Contact info@hopo.ai to begin.